Sprint Planning · Pre-Commitment Verification

You left the meeting aligned.
Engineering didn't.

ProjanAI stress-tests your requirements before the sprint starts — catching gaps, assumptions, and misalignment before they become rework.

First 3 requirements free. No credit card.
Requirement Analysis — Sprint 14
As a user, I can reset my password via email link that expires in 24 hours.
✓ Verified
As an admin, I can export user data to CSV.
Which fields? Date range filter? Who can trigger this — all admins or specific roles?
Needs Clarification
The dashboard should load faster.
No acceptance criteria. No measurable threshold. Cannot be verified or tested.
Blocked
The Problem

You write detailed requirements. You run alignment sessions. You get everyone to nod.

Two weeks later engineering delivers something that wasn't what you meant.

The problem isn't effort. It's that nobody verified you all understood the same thing.

How It Works

Three steps to a verified sprint

No new workflow. No integrations to configure. Paste, review, commit.

📋
Paste your requirements
Drop in your user stories or requirement statements. No formatting needed. Works with anything from Notion, Confluence, or your own docs.
Get an instant stress-test
ProjanAI flags ambiguity, unstated assumptions, edge cases, and dependency risks — per requirement, not as a generic summary.
Commit with confidence
Resolve flagged items, get sign-off from your engineering lead and stakeholders, and lock the sprint with a verified commitment record.
Features

Everything you need before the sprint starts

Built for PMs and project leads who are tired of finding out too late.

🔍
Requirement Analysis
Instant report flagging ambiguity, assumptions, edge cases, and dependency risks — per requirement, not per sprint.
↔️
Interpretation Gap Detection
Surfaces where product and engineering are reading the same requirement differently — before anyone writes a line of code.
🤝
Team Sign-Off
PM, engineering lead, and stakeholders each confirm shared understanding. No more assumed alignment.
📄
Commitment Record
Timestamped record of what was agreed, by whom, and when — generated at the moment of sign-off.
📊
Sprint Dashboard
Track alignment scores, open gaps, and unresolved risks across sprints to see if things are actually improving.
💬
Feedback Loop
Rate every analysis report. Thumbs down opens a text field. Your feedback shapes how the tool improves.
Pricing

Start free. Pay when it's worth it.

Flat team pricing — not per seat. The pain is shared across the planning squad.

Free
$0
Try it right now — no signup needed.
  • Stress-test up to 3 requirements
  • Instant flagged report
  • No account required
Solo
$29/mo
Individual PM or project lead.
  • Unlimited requirement analysis
  • Personal alignment dashboard
  • Sprint history
Growing Team
$249/mo
Up to 25 people — mid-size product teams.
  • Everything in Small Team
  • Team-wide alignment dashboard
  • Gap trends across sprints
  • Risk flags at commitment point
FAQ

Common questions

Do I need to sign up to try it?
No. Paste your first 3 requirements and get an instant report — no account needed. Sign up only when you want to save your history and run full sprints.
What if my team won't use another tool?
ProjanAI works wherever you already write requirements — paste from Notion, Confluence, Jira, or anywhere else. No new workflow required for your team.
Is my data stored or used for training?
No. Your requirements are used only to generate your report and are not stored, shared, or used to train any model.
Can I lock in the current price?
Yes. Founding users who upgrade now keep their price for life — regardless of future pricing changes.

Stop finding out two weeks too late.

Paste your next sprint's requirements and see what your team missed.